Task: creation of a large low-temperature storage complex for food storage and its expansion
Object: within the framework of two construction phases, a refrigerated warehouse with a total area of 12.2 thousand sq.m. The facility is equipped with the best European equipment manufacturers. The second phase of the object of 4.5 thousand square meters. meters put into operation in 2018, under the additional needs of the existing tenant.